Does the EasySolar app overestimate simulated electricity production by a PV plant? What is the error of the offered analysis?
The application does not overstate the simulation of energy production. The adopted calculations are theoretical based on the assumed losses in the photovoltaic system (cables, dirt, DC / AC conversion), the application is at the level of 10%. The algorithm
Can the application be used in construction or engineering projects, e.g. designing electrical connections?
The EasySolar application is not a typical Autocad design program that allows you to perform a construction project. The application is mainly used to perform initial concepts, visualizations and economic calculations needed at the sales stage and is intended mainly for
I cannot launch the website / application. I’m getting error 504/502.
If you have encountered one of the above-mentioned problems, most likely our website is being updated or moderated by our technical service department. Please try to restart the website in a few minutes or contact us by e-mail via chat (bottom